Ofon Plaftform Case Study

Case Study CS0004 - Ofon Platform


Client: Hyundai Heavy Industries Co., Ltd
End user: TOTAL France
Year of Completion: 2011


The OFON2 platform is located 40km offshore Nigeria and comprises of three new wellhead platforms which include new wells, a new production platform with processing facilities including oil, gas treatment and export, power generation, water injection, gas lift and water treatment, as well as one living quarter platform to accommodate the OFON site team.

Project Details

A key objective was to improve operating conditions by installing living quarters onsite, resizing water injection, installing water treatment capacity and improving gas lift activation to existing new wells. DESMO’s scope involves the HVAC and mechanical design, detailed engineering, equipment and spare parts procurement, material selection, inspection, fabrication, assembly, painting and coating, insulation and shop testing, third party agency certification, documentation, preservation and delivery.

Major Equipment Supplied

  • Air handling units: 2 x 458kW and 2 x 309kW
  • Water cooled chillers: 2 x 857kW
  • Duct heaters: 18
  • Ventilation fans: 13
  • HVAC control panel: 1
  • Chilled water pumps: 4
  • Fire dampers: 48
  • Volume control dampers: 63
  • Shut-off dampers: 31
  • Pressure relief dampers: 11
  • Grilles / diffusers: 1 lot
  • Heat exchangers: 2
  • Expansion tanks: 2
  • Buffer tanks: 1
  • Dosing tanks: 2
  • Valves: 1 lot
  • Instruments: 1 lot
  • Fresh air intake system: 2